Every migration plan answers the same questions. What are we moving. How long will it take. In what order. Who is needed, and for how long. How will we know it worked.
Those answers all depend on figures from the source system. And the figures are not on the screen anyone is looking at. The project list gives you names. What a plan needs is what sits underneath the names: the volume in each project, the revision history behind that volume, how unevenly it is distributed, and how the structure is arranged.
That information exists. It is simply spread across dozens of projects and screens, which is why it usually gets estimated in a meeting rather than counted. A data discovery scan counts it instead, in one pass, without touching anything in the source.
This is the first stage of migration, and the plan is its output. Everything downstream is built from what this stage produces: scope, effort, sequencing, sign-off, and the checks you run at the end.
What does a migration plan need before you can commit to it?
Five inputs. Each one decides a different part of the plan, and none of them can be inferred from the project list.
- Inventory: Decides what you are committing to. What entities and records exist, and how many of each. This is the figure your effort estimate is built on.
- Scope: Decides the boundary. Which projects, workspaces, or repositories are moving, and which are deliberately staying behind. An explicit exclusion is a decision; an unexamined one is a gap.
- History: Decides your timeline. How many past versions sit behind those entities. A migration moves history alongside current state, so this figure often matters more to the schedule than the item count does.
- Distribution: Decides your sequence. Where the volume is concentrated. Estates are rarely evenly loaded, and one project frequently holds a disproportionate share, which changes what moves first and what moves alone.
- Structure: Decides your scope arithmetic. How projects and hierarchies are arranged, and whether a reported count covers a full hierarchy or only its top level. The difference between those two readings can be substantial.
With these five, the plan is arithmetic. Without them, scope is whatever was assumed, effort is whatever was estimated, and the running order is whatever seemed convenient. The plan still gets written either way; the difference is whether it survives contact with the migration.
Here is the same plan, written both ways.
What does a data discovery utility show you?
A data discovery utility connects to your source system and reports what is in it. It is read-only. It does not move, change, or delete anything, which means you can run it at any point, while the business case is still being argued and long before a migration is approved. Running it commits you to nothing.
The output falls into six categories:
- Data volume: How many entities or records exist, broken down by project or by type.
- Historical depth: How many revisions sit behind those entities, where the platform supports revision analysis.
- Scope and distribution: How the data is spread across projects, workspaces, or repositories.
- Relationships and structure. How entities are organised within the source, including whether reported totals cover a full project hierarchy or only its top parent level.
- Configuration. Templates, fields, and similar settings, where the source platform supports configuration discovery.
- Version control. Repository, changeset, and related information, where the source platform supports it.
Two of these decide more of the plan than the rest, and both are routinely missed.
History is the one that moves timelines. A project with 4,000 items and ten years of activity is not a 4,000-item migration. Every edit made across those ten years is a separate version, and history moves alongside current state. It is common for the revision count to be a multiple of the item count, and it is the item count that people plan around.
Hierarchy reporting is the one that moves scope. Whether a count covers parent projects only or everything beneath them can change a total substantially, and it is exactly the kind of detail that stays unexamined until the migration is already running.
What a scan can report depends on the source platform and the scenario. A category available for one ecosystem does not automatically exist for another, so confirm what your source supports before assuming a scan will answer a particular question.
How do you run a discovery scan?
Four steps, whichever platform you are scanning.
What this looks like in practice?
Where discovery sits, and what comes next?
A migration runs in five stages. Discovery is the first, and the plan is what it hands to the rest.
- Discover. What is there? Measure volume, history, distribution, structure, and setup, as far as the platform reports them.
- Assess. What does it mean? Read the figures against your goals. A heavy revision history means one thing if you need all of it and something else if you do not.
- Plan. What moves, how, and in what order? Turn the assessment into scope, effort, sequence, schedule, and checks.
- Migrate. Execute the plan.
- Validate. Does the target match? Compare it against the figures captured in stage one.
The first stage and the last are the same measurement, taken twice. That is the argument for keeping the output rather than discarding it once the plan is written.
The strongest migration plans are not built on what a team believes is in the source system. They are built on what the team can show is in it.
Skipping discovery does not remove the work. It relocates it to the point where changing direction is most expensive. So run the scan yourself. It is read-only, it costs nothing, and it is useful whatever you decide next. Then bring us the output. Our experts will work through it with you and turn it into a Migration Strategy Blueprint covering your recommended approach, scope, key risks, dependencies, and execution roadmap without any obligation.